top of page

Water Distribution Improvement

This project included two crossings using pipe ramming methods to install 200 feet of 30 inch casing. With large boulders expected, Coleman Construction preemptively upsized the casing from 20 inch diameter to 30 inch diameter to ensure the crossing would go the distance. With both crossings, we were able to allow our General Contractor to successfully install carrier pipe under US Highway 191, without any affect on the local community’s main access road thru the town of Big Timber, Montana.

Project Gallery

bottom of page