CCI Trenchless recently completed a highly challenging infrastructure project for the Montana Department of Transportation. The task involved replacing a 4-foot diameter culvert with a 7-foot diameter tunnel, spanning a total of 220 feet. This project was located in a remote area of Montana, adding to the complexity of the job.


Our team employed a custom-designed steering head, developed and rigorously tested by CCI, to ensure precise and efficient installation. To meet the tight deadline, work was carried out 24 hours a day for 5 consecutive days, allowing us to complete the project in less than 1.5 weeks—from mobilization to completion and demobilization.


Despite the challenges posed by the rural location, this project stands as a testament to CCI’s commitment to innovative problem-solving. Our ability to develop creative solutions not only drove down the costs but also significantly increased efficiency, ensuring the successful completion of this critical infrastructure upgrade.

Project Gallery

bottom of page